The primary park contains a capacity of two hundred MW although Sandrini II provides a capability of 100 MW. The whole expense of both initiatives weren't disclosed having said that, all through development, over 200 staff had been utilized. The tasks are anticipated to check out A few positions opening https://californiasolarcompany.game.blog/