The 25mm thick major metal tube is driven Along with the close closed by a steel shoe. On reaching the demanded driving resistance, an entire size cage is reduced in to your tube and crammed with substantial slump concrete. The tube is then vibrated out leaving a shaft of concrete. https://brooksxhlor.acidblog.net/63672403/the-5-second-trick-for-cast-in-situ-piles-in-dhaka