Payment must be structured in phases tied to completion milestones as an alternative to spending almost everything upfront. Maintain back the ultimate payment right up until you have inspected and authorized all work. All the things that has been in connection with the flood drinking water will should be disinfected https://www.google.com/maps/d/edit?mid=1WKHKOYE-s7mnN_zVjOf13VGSLyRHSMA&usp=sharing